FIRE ROPES
Descriptive FIRE ROPES
Material: Ceramics or glass fibre
Cord for a width of joint from 12 to 60 mm
Panel firebreak for joints from 60 to 250 mm
Do not absorb the humlidity
Isensible with the aggressive chemical agents
Does not contain asbestos
Fire resistance 4:00
Options: clips of fixing, cement firebreak
Implementation FIRE ROPES
• To treat firebreak all types of horizontal and vertical joints: joints of grounds, walls and ceilings; joints between ready-made units of frontages; joints between nose of floors and frontages.
• For the partitions firebreak, passages of sheaths and conduits, service shafts, protection of supports neoprene.
• Joint sealing at the top of masonry: firebreak treatment between floor and curtain wall. (cf Examples of applications) For the installation of the cords it is necessary to refer to the notes of installation N°1 and N°2 validated by the official PV of Ranking. Usable for all types of buildings: hospitals, buildings industrial and of offices, dwellings, hotels, shopping centres, carparks, schools, high schools, colleges, stations, airports, stages, etc
size paletization FIRE ROPES
Polyethylene High density
References | Openning Joint (mm) | Movements (mm) | visible width (mm) | total width (mm) | Height (mm) |
C12 | 10 | +20% / -80% | 10 | 12 | 12 |
C20 | 12 | +20% / -80% | 12 | 20 | 20 |
C30 | 20 | +20% / -80% | 20 | 30 | 30 |
C40 | 25 | +20% / -80% | 25 | 40 | 40 |
C50 | 30 | +20% / -80% | 30 | 50 | 50 |
C60 | 40 | +20% / -80% | 40 | 60 | 60 |
C80 | 50 | +20% / -80% | 50 | 80 | 80 |
C90 | 60 | +20% / -80% | 60 | 90 | 90 |
C100 | 65 | +20% / -80% | 65 | 90 | 90 |
C120 | 80 | +20% / -80% | 80 | 120 | 120 |
C150 | 100 | +20% / -80% | 100 | 150 | 150 |
Vedafeu C170 | 110 | +20% / -80% | 110 | 170 | 170 |
Vedafeu C180 | 120 | +20% / -80% | 120 | 180 | 180 |
2 x Vedafeu C150 | 200 | +20% / -80% | 200 | 300 | 150 |